Power supply system for the Zhanazhol and Kenkiyak facilities from the steam turbine power station -160 MW of the gas turbine power station -45 extension with the reinforcement of the 110 kV overhead lines, the reorganization of the PA and system of relay protection and automation system, and with the organization revenue metering with “Energosistema” LLP at 110/35 / 10 kV "Kenkiyak-4" of Mugalzhar and Temir districts of Aktobe region.