Set goals of reaching 3% in total electricity output by year 2020, 10% - by 2030, and 50% - by 2050 are possible but require a lot of joint work of GOV and Investors.
- Scheme of power distribution
- develop a feasibility study (feasibility study) of construction
- development of design estimates
- help in finding potential investors, equipment suppliers;
- Assistance in obtaining permits and approvals, passing expertise
- survey work and develop documentation for all the above types of work and services.
Our work on RES:
- 2010 y feasibility study “Construction of the Kordai WPP with a capacity of 21 MW in the Zhambyl region”
- 2011 y. “Scheme of power distribution from the planned for construction of the wind farm "Baidibek-1" in Zhambyl region with a capacity of 210 MW”
- 2011 y. feasibility study “Construction of the "Baidibek-1" WPP with a capacity of 210 MW in the Zhambyl region ".
- 2012 y. "Scheme for power distribution from the 100 MW WPP Sofiyivka in Akmola region”
- 2013 y. Feasibility study "Construction of wind power station in Shelek corridor, capacity 60 MW with the prospect of expansion to 300 MW"
- 2014 y. "Scheme of power distribution of a solar power station (SPP) with a capacity of 25 MW in the city of Kapshagai, Almaty region"
- 2015 year. "Scheme of power distribution of the solar power plant in the Shet region, Agadyr village of the Karaganda region, with a capacity of 50 MW"
- 2015 year. "Scheme of power distribution from the planned for construction solar power plant LLP" YUKSES 50 "with a capacity of 50 MW in the territory of Sozak district, Sholakkorgan settlement of the South Kazakhstan region"
- 2016 year. "Scheme of power distribution capacity for the construction of a wind power plant with a capacity of 7.5 MW in Tayynshinsky district, Tayinsha, North Kazakhstan region "
- 2016 year. "Scheme of power distribution for the facility" Construction of hydroelectric power plant ГЭС -1 installed capacity of 3 MW on the river Zhinishke in Rayymbek district of Almaty region"
- 2016 year. "Scheme of power distribution for the facility" Construction of hydroelectric power plant HPP-2 installed capacity of 3 MW on the river Zhinishke in Rayymbek district of Almaty region"
- 2017 y.Scheme for power distribution of the HPP cascade on the irrigation canal of the river. Koksay, located in Zhualinsky district of Zhambyl region
- 2018 y. “Scheme of power distribution from a solar power plant in Uygur district of Almaty region»
- 2018 y. Working project "Construction of a 100 MW solar power plant in Saran, Karaganda region
- 2018 y “Construction of a 220 kV КТЛ-1 SS with a 220 kV overhead line to connect a solar power plant near Agadyr village of Karaganda region to 220 kV outdoor switchgear of 500 kV Agadyr substation”
Wind station Kordai 21 MW
Solar station Kapshagai 2 MW